With existing warehouse space at full capacity and the need to add manufacturing capabilities, Smuckerís, in conjunction with our in house design group, planned a 50,000 square foot building expansion to the existing facility. The additional space allowed more room to streamline the packaging and palletizing operation. Working in designated critical area near the coastal waterways presented challenges in careful design of the storm water management system to properly maintain runoff from the building. The project was completed in less than 24 months including all permitting, environmental studies, and construction. NAGC managed all aspects of this project.